Details for SR 400 Collector/Distributor Lanes

Project Number: NH000-0056-01(052)
Project ID: 721850-
Description: The project adds two Collector Distributor lanes (plus auxiliary lanes) on SR 400 NB and SB from I-285 to Spalding Drive. The existing north facing ramps at the Hammond Drive Half Diamond interchange will be modified to access the proposed CD lanes. The project will reconstruct the Abernathy Road interchange and will be designed not to preclude construction of managed lanes on SR 400 in the future.
Type Work: Interchange

County Congressional District

Fulton 5
Fulton 6
Fulton 11
Fulton 13

DOT District :  7
Municipal Planning Organization Area:  Atlanta TMA

Phase Approved Cost

PE 1993 $556,921.23
ROW 1998 $50,992,900.00
PE 2015 $8,630,000.00
PE 2014 $15,300,000.00