Current Open House Information for SR%20400%20Collector/Distributor%20Lanes
General Description: THE PROPOSED PROJECT CONSISTS OF A NEW COLLECTOR-DISTRIBUTOR (CD) SYSTEM ALONG SR 400 FROM INTERSTATE 285 (I-285) NORTH OF SPALDING DRIVE, AND THE RECONSTRUCTION OF THE ABERNATHY ROAD INTERCHANGE. AS PART OF THIS PROJECT, FIVE NEW BRIDGES WOULD BE CONSTRUCTED, THE SOUTHBOUND SR 400 BRIDGE OVER 1-285 WOULD BE WIDENED AND THE SPALDING DRIVE BRIDGE OVER SR 400 WOULD BE MODIFIED. THE TOTAL LENGTH OF THE PROPOSED PROJECT IS APPROXIMATELY FOUR MILES.

Open House Date: 11/18/2014

Documents

Document Date
  • 721850 PIOH DISPLAY_2014.11.17.pdf
  • 11/18/2014
  • 721850- PIOH Welcome Package.pdf
  • 11/18/2014
  • 721850- PIOH Welcome Package-SPA.pdf
  • 11/18/2014