Public Outreach Home   Comment   History   Details   Public Outreach Help
Current Open House Information for SR 20 FM SHARON CHURCH ROAD TO BRAND ROAD
General Description: This project is located in eastern Walton County, beginning just north of the intersection of SR 20 with Rosebud Road/Miller Bottom Road and ending at Brand Road in Loganville. The total project length in SR 20 is approximately 6.75 miles, and the length of the capacity improvements is 2.18 miles. The project includes intersection improvements along SR 20 at Moon Road/Center Hill church Road, Centerville-Rosebud Road, and McCullers Road. The existing 2-lane roadway will be widened to a five-lane roadway beginning south of Sharon Church Road and will transition from the five-lane section to a one-way pair north of Overlook Drive. The one-way pair will utilize existing SR 20/Main Street as the two northbound travel lanes and CS Floyd Road as the two southbound travel lanes. The one-way pair will continue through downtown Loganville and end at SR 20/SR 81. The project will then continue west on SR 20 until reaching Brand Road.

Open House Date: 04/26/2016

Documents

Document Date
  • 142000_NEPA_PIOH Handout_2016.04.26.pdf
  • 04/26/2016
  • 142000- SR 20 Typical sections.pdf
  • 04/26/2016
  • 142000- SR 20 Display 1.pdf
  • 04/26/2016
  • 142000- SR 20 Display 2.pdf
  • 04/26/2016
  • 142000- SR 20 Display 3.pdf
  • 04/26/2016
  • 142000- SR 20 Display 4.pdf
  • 04/26/2016
  • 142000- SR 20 Display 5.pdf
  • 04/26/2016
  • 142000- SR 20 Display 6.pdf
  • 04/26/2016